1. Produktet er slutview
The GEYA GRT6-B2 is an electronic delay off time relay designed for industrial and domestic applications. It features adjustable delay settings and is suitable for DIN rail mounting. This manual provides essential information for safe installation, operation, and maintenance.
Nøglefunktioner:
- Justerbar forsinkelse: Delay can be set directly via panel knobs for convenience and intuitive control.
- Funktionstilstande: Supports two primary functions: Delay ON (A) and Delay OFF (B). The GRT6-B2 model features 2SPDT (2NO2NC) contacts.
- Bredt tidsinterval: Time scale from 0.1 seconds to 10 days, divided into 10 selectable ranges.
- Statusindikation: Equipped with LED indicators for power (green light) and working status (red light).
- Kompakt design: Ultra-small size, only 18mm width, designed for 35mm DIN rail mounting.

2. Sikkerhedsoplysninger
Please read this manual carefully before installation and operation. Failure to follow these instructions may result in equipment damage, injury, or death. This device should only be installed and serviced by qualified personnel.
- Afbryd altid strømmen før installation, ledningsføring eller vedligeholdelse på enheden.
- Sørg for, at al ledningsføring overholder lokale og nationale elektriske forskrifter.
- Brug ikke apparatet, hvis det er beskadiget eller ikke fungerer korrekt.
- Beskyt enheden mod fugt, støv og ekstreme temperaturer.
- Bekræft korrekt voltage and current ratings before connecting to a power source.
3. Product Dimensions and Components
The GRT6-B2 relay is designed for compact installation on a DIN rail. Understanding its dimensions and component layout is crucial for proper integration into your system.


4. Installation og ledningsføring
The GEYA GRT6-B2 relay is designed for easy installation on a 35mm DIN rail. Follow these steps for secure mounting and correct electrical connections.
4.1 DIN-skinnemontering
The relay snaps onto a standard 35mm DIN rail. Ensure it is securely fastened to prevent movement during operation.
4.2 Elektriske ledninger
Refer to the wiring diagrams below for proper connection of the power supply and load. Always ensure power is disconnected before wiring.

4.3 Power Connection Demonstration
Watch this video for a visual guide on connecting power and load to the GRT6-B1 model, which shares similar wiring principles with the GRT6-B2.
5. Betjeningsvejledning
The GRT6-B2 relay offers adjustable delay functions. Follow these steps to configure and operate your device.
5.1 Funktionstilstande
The GRT6-B2 supports two main function modes:
- A: Delay ON: The output contacts close after a set delay time once power is applied.
- B: Delay OFF: The output contacts open after a set delay time once the trigger signal is removed or power is disconnected.

5.2 Tidsindstilling
The delay time is set using two rotary knobs on the front panel: one for time range and one for percentage.

5.3 LED-indikatorer
- Grøn LED: Angiver strømforsyningens status.
- Rød LED: Indicates the working status of the relay (e.g., timing in progress, output active).
6. Vedligeholdelse
The GEYA GRT6-B2 time relay is designed for reliable operation with minimal maintenance. However, periodic checks can help ensure its longevity and proper function.
- Rensning: Hold enheden ren og fri for støv og snavs. Brug en tør, blød klud til rengøring. Brug ikke flydende rengøringsmidler.
- Inspektion: Periodically inspect wiring connections to ensure they are secure and free from corrosion. Check for any signs of physical damage or overheating.
- Miljø: Sørg for, at driftsmiljøet forbliver inden for de angivne temperatur- og fugtighedsområder for at forhindre for tidlig fejl.
7. Fejlfinding
If the GEYA GRT6-B2 relay is not functioning as expected, consider the following common issues:
- No Power Indication (Green LED Off): Check the power supply connections (A1, A2) and ensure the voltage is within the specified range (AC/DC 24V-240V).
- Relay Not Activating/Deactivating:
- Verify the function mode (A or B) is correctly selected.
- Check the time range and percentage indstillinger.
- Ensure the trigger signal (S) is correctly applied for Delay OFF functions.
- Inspect load connections and ensure the load is functioning correctly.
- Forkert timing: Re-check the time range and percentage settings. Ensure the knobs are firmly set to the desired values.
- Overophedning: If the device feels excessively hot, check the load current to ensure it does not exceed the relay's maximum rating (10A/AC1).
If problems persist after checking these points, contact a qualified electrician or the manufacturer for assistance.
8. Specifikationer
Detailed technical specifications for the GEYA GRT6-B2 time relay.

| Parameter | Værdi |
|---|---|
| Mærke | GEYA |
| Model | GRT6-B2 |
| Fungere | Delay ON (A), Delay OFF (B) |
| Forsyningsterminaler | A1-A2 |
| VoltagRækkevidde | AC/DC 24V-240V (50-60Hz) |
| Strømindgang | AC max. 6VA/1.9W |
| Tidsintervaller | 0.1s - 10 days (ON, OFF) |
| Tidsindstilling | Potentiometer |
| Produktion | 2xSPDT (2NO2NC) |
| Nuværende vurdering | 10A/AC1 |
| Switching Voltage | 250 VAC / 24VDC |
| Driftstemperatur | -20°C til +55°C (-4°F til 131°F) |
| Opbevaringstemperatur | -35°C til +75°C (-22°F til 158°F) |
| Montering | DIN rail EN/IEC 60715 |
| Dimensioner (L x B x H) | 64 mm x 18 mm x 95 mm (ca.) |
| Vægt | Ca. 2.08 ounces |
9. Garanti og support
For warranty information, please refer to the documentation provided with your purchase or contact your seller. If you require technical support or have questions regarding the GEYA GRT6-B2 time relay, please reach out to the manufacturer or authorized distributor.





