ACE ICX7550-24P-E2-R3

ACE Ruckus ICX7550-24P-E2-R3 24-Port Gigabit PoE+ Switch Brugermanual

Model: ICX7550-24P-E2-R3

1. Introduktion og overview

This manual provides essential information for the installation, operation, and maintenance of the ACE Ruckus ICX7550-24P-E2-R3 24-Port Gigabit PoE+ Switch. This high-performance 1U rack-mount managed switch offers 24 ports of 10/100/1000 Mbps PoE+ with a 1.2 kW power budget and two 40 Gigabit QSFP+ uplinks, along with a USB Type-C console. It is designed for enterprise campus, data center, and edge deployments, supporting IP phones, wireless access points, cameras, and IoT devices.

The ICX7550-24P-E2-R3 is built for high availability and scalability, featuring dual hot-swappable power supplies, redundant fans, and the ability to stack up to 12 switches. Its advanced Layer 2 and Layer 3 capabilities ensure secure, low-latency traffic for critical applications.

Front view of multiple ACE Ruckus ICX7550-24P-E2-R3 switches stacked

Figur 1: Forside view of ACE Ruckus ICX7550-24P-E2-R3 switches, showcasing 24 Gigabit PoE+ ports and 40G QSFP+ uplinks.

2. Nøglefunktioner

  • 24 Gigabit PoE+ Ports: Provides 10/100/1000 Mbps connectivity with Power over Ethernet Plus, supporting a 1.2 kW power budget for connected devices.
  • 40G QSFP+ Uplinks: Two integrated 40 Gigabit QSFP+ ports for high-speed backbone connections and flexible network architecture.
  • USB Type-C Console: Modern console interface for local management and configuration.
  • Advanced Layer 2/3 Switching: Supports static routing, Multi-Chassis Link Aggregation Group (MLAG), Quality of Service (QoS), Access Control Lists (ACLs), IGMP snooping, and multicast for robust network control.
  • Stabelbart design: Allows stacking of up to 12 Ruckus switches for unified management, hitless upgrades, and scalable network expansion.
  • Høj tilgængelighed: Equipped with dual hot-swappable power supplies and redundant fans to ensure continuous operation and minimize downtime.
  • Hukommelse: Features 4 GB RAM and 4 GB flash memory for efficient operation and storage of configurations.
  • TAA Compliance: Meets Trade Agreements Act requirements, suitable for government deployments.

3. Pakkens indhold

Verify that all items are present and undamaged upon unpacking. If any items are missing or damaged, contact your reseller immediately.

  • ACE Ruckus ICX7550-24P-E2-R3 Switch Unit
  • Power Cords (quantity may vary based on region)
  • Rack Mount Kit (brackets, screws)
  • USB Type-C Console Cable
  • Dokumentation (f.eks. hurtigstartguide, sikkerhedsoplysninger)

4. Opsætning og installation

4.1 Fysisk installation

  1. Rack montering: Securely attach the provided rack mount brackets to the switch using the included screws. Install the switch into a standard 19-inch equipment rack, ensuring adequate ventilation space around the unit.
  2. Miljøhensyn: Ensure the installation environment meets the operating temperature and humidity requirements specified in the technical specifications. Avoid placing the switch near heat sources or in areas with excessive dust.

4.2 Strømtilslutning

  1. Connect the power cords to the dual hot-swappable power supply units at the rear of the switch.
  2. Plug the other end of the power cords into grounded AC power outlets. The switch will power on automatically.

4.3 Netværksforbindelser

  1. Ethernet-enheder: Connect your network devices (IP phones, wireless access points, cameras, computers) to the 24 Gigabit PoE+ ports using standard Ethernet cables.
  2. Uplink-forbindelser: Use appropriate QSFP+ transceivers and fiber optic cables to connect the two 40G QSFP+ uplink ports to your core network or other switches.

4.4 Konsolforbindelse

  1. Connect the USB Type-C console cable from your management workstation to the USB-C console port on the switch for initial configuration and command-line interface (CLI) access.
Bag view of multiple ACE Ruckus ICX7550-24P-E2-R3 switches stacked, showing power supplies and fan modules

Figur 2: Bagside view of ACE Ruckus ICX7550-24P-E2-R3 switches, highlighting the dual hot-swappable power supplies and fan modules.

5. Betjening af kontakten

5.1 Indledende tænding

Once connected to power, the switch will initiate its boot sequence. Observe the system status LEDs on the front panel to confirm successful startup.

5.2 Adgang til administrationsgrænsefladen

  • Kommandolinjegrænseflade (CLI): Access via the USB Type-C console port or remotely via SSH after initial network configuration.
  • Web- Baseret ledelse: Access the graphical user interface (GUI) by entering the switch's IP address into a web browser. The default IP address and login credentials can be found in the Quick Start Guide or product documentation.

5.3 Grundlæggende konfiguration

After accessing the management interface, perform essential configurations such as:

  • Setting the management IP address and subnet mask.
  • Configuring VLANs for network segmentation.
  • Enabling and configuring PoE settings for connected devices.
  • Setting up user accounts and access privileges.
  • Configuring time and date settings (NTP).

6. Vedligeholdelse

6.1 firmwareopdateringer

Regularly check the ACE or Ruckus Networks support website for the latest firmware versions. Updating the firmware ensures optimal performance, security, and access to new features. Follow the provided instructions carefully during the update process.

6.2 Rengøring og miljøpleje

  • Keep the switch and its surroundings clean and free of dust. Dust accumulation can impede airflow and lead to overheating.
  • Use a soft, dry cloth for cleaning the exterior. Do not use liquid or aerosol cleaners.
  • Ensure proper airflow by keeping ventilation openings clear.

6.3 Status for overvågningssystem

Regularly monitor the switch's health and performance through the management interface. Pay attention to system logs, port status, CPU utilization, and temperature readings to identify potential issues early.

7. Fejlfinding

This section provides basic troubleshooting steps for common issues. For more complex problems, refer to the comprehensive product documentation or contact technical support.

7.1 Strømproblemer

  • Ingen strøm: Verify that power cords are securely connected to both the switch and the power outlets. Check power outlet functionality.
  • Power Supply Failure: If one power supply fails, the other should maintain operation. Check the status LEDs for the power supplies. Replace faulty units if necessary.

7.2 Problemer med netværksforbindelse

  • Portlink ned: Check the Ethernet cable connection to the device and the switch port. Verify the device is powered on and functioning.
  • Ingen netværksadgang: Confirm IP address configuration, VLAN assignments, and routing settings. Check for IP address conflicts.

7.3 PoE Functionality Issues

  • Enheden modtager ikke strøm: Ensure the connected device is PoE-compatible. Check PoE settings on the switch port. Verify the total PoE power budget is not exceeded.

7.4 Problemer med konsoladgang

  • Cannot Connect via USB-C: Ensure the correct USB driver is installed on your management workstation. Verify terminal emulator settings (e.g., baud rate, data bits, parity, stop bits).

8. Tekniske specifikationer

FeatureSpecifikation
ModelnummerICX7550-24P-E2-R3
Havne24 x 10/100/1000 Mbps PoE+
Uplink-porte2 x 40G QSFP+
PoE Power Budget1.2 kW (1123.7 W max draw)
KonsolportUSB Type-C
VÆDDER4 GB
Flash-hukommelse4 GB
Formfaktor1U Rack Mount
StrømforsyningerDual Hot-Swappable
Kompatible enhederWi-Fi & Ethernet Devices
FabrikantRUCKUS & ACE
UPC199240108239
Dato først tilgængelig14. august 2025

9. Garanti og support

For technical support, warranty information, or service requests, please refer to the official ACE or Ruckus Networks website or contact your authorized reseller. Keep your purchase receipt and product serial number readily available when seeking support.

Relaterede dokumenter - ICX7550-24P-E2-R3

Preview ACE Pro Digital-Alkoholtester: Bedienungsanleitung und Technische Daten
Umfassende Bedienungsanleitung for den ACE Pro digitalen Alkoholtester. Enthält Informationen zur Bedienung, Kalibrierung, Wartung, teknisk data og garanti fra ACE Handels- og Entwicklungs GmbH.
Preview ACE App: Anleitung zum Zurücksetzen des Passworts
Schritt-für-Schritt-Anleitung, wie Sie Ihr Passwort in der ACE App zurücksetzen können. Erfahren Sie, wie Sie auf Ihr Konto zugreifen, wenn Sie Ihr Passwort vergessen haben.
Preview ACE.BOIL vandsystem brugermanual og installationsvejledning
Omfattende brugermanual og installationsvejledning til ACE.BOIL-vandsystemet fra ACE Water Systems. Dækker produktfunktioner, sikkerhed, installation, vedligeholdelse og fejlfinding for denne kogende vanddispenser til køkkenet.
Preview ACE Fase 2: Bevægelsestræning - Optimering af bevægelseseffektivitet
Udforsk Fase 2: Bevægelsestræning fra ACE Integrated Fitness Training (ACE IFT)-modellen. Denne guide beskriver fem grundlæggende bevægelsesmønstre og giver omfattende rubrikker til vurdering af bevægelsesevner, hvilket er afgørende for at forbedre sundhed, fitness, præstation og forebygge skader.
Preview ACE All-in-one Karaoke-afspiller brugervejledning
Omfattende brugervejledning til ACE All-in-one Karaoke Player, der beskriver funktioner, opsætning, sanghåndtering og betjening for en forbedret karaoke-oplevelse. Lær, hvordan du vælger sange, administrerer dit bibliotek og tilpasser indstillinger.
Preview ESS DampTeknologikatalog: Industrielle støddæmpere og bevægelseskontrol
Udforsk ACE's omfattende katalog på dampteknologi, herunder industrielle støddæmpere, gasfjedre, vibrationskontrolløsninger og automatiseringskomponenter. Find tekniske specifikationer og anvendelseseksempleramples.