1. Introduktion
This manual provides detailed instructions for the assembly, installation, and operation of your TECMOJO 12U Open Frame Network Rack. Please read these instructions carefully before beginning assembly to ensure proper setup and safe use of the product. Retain this manual for future reference.
2. Produktet er slutview
The TECMOJO 12U Open Frame Network Rack is designed for organizing IT and AV equipment. It features a 4-post design, mobility with casters, and includes server shelves and mounting hardware for 19-inch network, audio, and video devices.
2.1 Nøglefunktioner
- Belastningskapacitet: Constructed from durable cold-rolled steel, offering a load-bearing capacity of 260 lbs (floor-mounted).
- Mobilitet: Equipped with four casters for easy movement. Casters include brakes for stability.
- Included Shelves: Comes with two ventilated 1U server shelves.
- Anti-skrid design: Features anti-slip shelf stops to secure devices on shelves.
- Kabelstyring: Integrated grommet holes on the top panel for organized cable routing.
- Alsidig montering: Supports both standalone and wall-mounted configurations.
2.2 Inkluderede komponenter
Kontroller, at alle nedenstående komponenter er til stede, før monteringen påbegyndes:

Figur 1: Inkluderede komponenter
- 12U Open Frame Server Rack (main frame components)
- 1U 14-inch Rack Shelf x 2
- Shelf Stop x 4
- Rack Shelf Back Support x 4
- Hjul x 4
- L Wrench x 1
- Velcrostrop x 4
- Kabelbinder x 4
- 10-32 Screw x 25 (for equipment mounting)
- M5*30 Wall Mounting Screw x 4
- Mounting Hole Drilling Template x 1
3. Specifikationer
| Attribut | Værdi |
|---|---|
| Model | 12U |
| Produktmål (D x B x H) | 20.2" x 20.5" x 21.0" (512 mm x 520 mm x 534 mm) |
| Varens vægt | 31.7 pund |
| Materiale | Legeret stål (koldvalset stål) |
| Farve | Sort |
| Load Capacity (Floor-mounted) | 260 lbs |
| Load Capacity (Wall-mounted) | 130 lbs |
| Rack Type | 4-Post Open Frame |

Figur 2: Produktmål
4. Opsætning og montering
Assembly typically requires one person and takes approximately 30-60 minutes. A power screwdriver is recommended for efficiency, though an L wrench is provided.
4.1 Monteringstrin
- Udpak komponenter: Carefully remove all parts from the packaging and verify against the 'Components Included' list.
- Saml ramme: Connect the side posts to the top and bottom frame sections using the provided hardware. Ensure all screws are tightened securely.
- Installer hjul: Attach the four casters to the bottom frame. Ensure the casters with brakes are positioned for easy access.
- Installer hylder: Position the 1U ventilated shelves at desired heights within the rack. Secure them using the provided 10-32 screws.
- Attach Shelf Stops and Back Supports: Install the anti-slip shelf stops on the shelves to prevent equipment movement. Attach the rack shelf back supports for enhanced stability and load capacity.

Figure 3: Rack with Equipment, showing Anti-Slip Shelf Stops and Back Support
4.2 Vægmontering (valgfrit)
For wall-mounted installations, use the included mounting hole drilling template and M5*30 wall mounting screws. Ensure the mounting surface can support the rack's weight and equipment (up to 130 lbs).

Figure 4: Wall Mounting Template and Option
5. Betjeningsvejledning
5.1 Installation af udstyr
- Align your 19-inch rack-mountable equipment with the tapped holes on the rack posts.
- Use the provided 10-32 screws to secure equipment. Ensure equipment is evenly distributed to maintain stability.
- For non-rack-mountable equipment, place them on the ventilated shelves and use the anti-slip shelf stops to prevent movement.
5.2 Kabelstyring
Utilize the grommet holes on the top panel for routing cables. Use the included Velcro straps and cable ties to organize and secure cables, preventing strain and improving airflow.

Figure 5: Detailed Features: Grommet Holes, Tapped Holes, and Casters
5.3 Mobilitet og stabilitet
- To move the rack, ensure all caster brakes are disengaged.
- When the rack is in its desired position, engage the caster brakes to prevent unintended movement.
6. Vedligeholdelse
- Rensning: Wipe the rack surfaces with a soft, damp klæde. Undgå slibende rengøringsmidler, der kan beskadige finishen.
- Inspektion: Kontrollér regelmæssigt alle skruer og forbindelser for at sikre, at de forbliver stramme. Spænd efter behov.
- Belastningsfordeling: Ensure equipment weight is evenly distributed to maintain rack stability and prevent stress on components.
7. Fejlfinding
- Rack-ustabilitet: Ensure all frame screws are fully tightened. Verify that caster brakes are engaged when the rack is stationary. Check for uneven weight distribution of equipment.
- Vanskeligheder ved montering af udstyr: Ensure equipment is 19-inch rack-mountable. If holes do not align, verify the rack posts are correctly assembled and not warped. Some minor adjustments may be needed during initial setup.
- Manglende dele: Refer to the 'Components Included' list. If parts are missing, contact Tecmojo customer support.
8. Garanti og support
For warranty information or technical support, please refer to the official Tecmojo webwebstedet eller kontakt deres kundeserviceafdeling. Gem din købskvittering til garantikrav.





