EARU EASEM-D-TY

EARU EASEM-D Multi-Circuit Power Meter User Manual

Model: EASEM-D-TY

1. Velkommen

The EARU EASEM-D Multi-Circuit Power Meter helps you monitor the amount of electricity consumed and produced in your facility by connecting current transformers (CT clamps) to the power cable.

Denne guide giver en overview of the product and assists you with the initial setup and installation.

Nøglefunktioner:

  • Tuya compliant: Supports automation with other Tuya devices.
  • Compatible with Single, Split-Phase 120/240VAC, and 3-Phase/4-wire 480Y/277VAC electricity systems.
  • Remotely monitors whole home energy and up to 16 individual circuits with 50A Sub CTs (e.g., solar, lighting, receptacles).
  • Bi-Directional measurement.
  • Realtidsmåling af Voltage, Strøm, effektfaktor, aktiv effekt og frekvens.
  • Historical data of Energy Consumed and Energy Production.

2. Sikkerhedshåndtering

WARNING: Failure to follow these safety notices could result in fire, electric shock, other injuries, or damage to the Power Meter and other property. Read all the safety notices below before using the Power Meter.

  • Undgå høj luftfugtighed eller ekstreme temperaturer.
  • Undgå langvarig udsættelse for direkte sollys eller stærkt ultraviolet lys.
  • Undlad at tabe eller udsætte enheden for intense vibrationer.
  • Du må ikke skille enheden ad eller prøve at reparere den på egen hånd.
  • Udsæt ikke enheden eller dens tilbehør for brændbare væsker, gasser eller andre eksplosive stoffer.

Important Safety Information for Installation:

  • Strømmåleren må kun installeres og serviceres af kvalificeret elektrisk personale.
  • Rør ikke ved terminalerne på enheden under test.
  • Sluk for strømmen, før du tilslutter eller frakobler den til en hjælpeenhed.
  • Dobbelttjek, at strømmen er slukket med en korrekt nominel voltage sensorenhed.

Manglende overholdelse af disse instruktioner vil resultere i dødsfald eller alvorlig personskade.

3. Lær din enhed at kende

The EARU EASEM-D Multi-Circuit Power Meter consists of the main unit and various accessories. Familiarize yourself with each component:

Product components including Host Module, Main CTs, Sub CTs, External Antenna, Power Cable, and Mounting Bracket.

Figur 1: Produktkomponenter

Hovedenhed overview:

Diagram of the main unit showing 3.5mm audio ports for Main CTs, 2.5mm audio ports for Circuit CTs, and the antenna connector.

Figure 2: Main Unit Ports

  • LED-indikator: Provides status information (see Troubleshooting section).
  • 3.5mm Audio Ports (Top): Inputs for Main CTs (L1/A, L2/B, L3/C).
  • 2.5mm Audio Ports (Sides): Inputs for Sub CTs.
  • Antennestik: For connecting the external antenna.
  • Power Input Port (Bottom): Til tilslutning af strømkablet.
  • Nulstil knap: Used for resetting the device (see Troubleshooting section).

4. Tekniske specifikationer

Product dimensions and parameters table.

Figur 3: Produktdimensioner og parametre

Trådløs forbindelse

FeatureSpecifikation
Wi-Fi802.11 b/g/n @ 2.4 GHz
RF-egenskaberOperating frequency: 2.4GHz, External magnetic antenna

Fysiske specifikationer

FeatureSpecifikation
Operation Voltage90~480 Vac 50/60 Hz
Nominel strøm200A / 300A (depending on model)
Målenøjagtighed±2 %
Understøttede systemerSingle-Phase up to 277VAC line-neutral, Split-Phase 120/240VAC, Three-Phase up to 480Y/277VAC (No Delta/wye/Y/Star Connection)
RapporteringscyklusHvert 15. sekund
Driftstemperatur-20℃~+55℃
Fugtighed≤ 90% ikke-kondenserende
Dimensioner111.3(L) x 81.2(B) x 41.4(H) mm
Batteri inkluderetIngen
Meget bekymret kemikalieIngen
CertificeringCE, FCC

CT Clamp Specifikationer:

ModelL (mm)W (mm)H (mm)Φ (mm)Vægt (g)
50A2624421057
200A / 300A34456624160

5. Installation

Note: The Power Meter must be installed and serviced only by qualified electrical personnel. Always turn off power before installation.

5.1. Sluk for strømmen

You need to turn off the main breaker in your electric panel to shut off all of the power in your home. However, the service mains are always live! Then remove screws securing the cover to the panel to access the circuit breakers.

Image showing a hand turning off a main breaker in an electrical panel.

Figure 4: Turning off Main Breaker

5.2. Find a Spot for Power Meter

Find a suitable spot for the Power Meter. You can fit it within your electrical panel or use the mounting bracket to fix it on the wall outside the electrical panel if there is no room.

Diagram showing options for mounting the power meter: on the wall or inside the electrical panel.

Figur 5: Monteringsmuligheder

5.3. Installer antennen

Locate the External Antenna outside the electrical panel to ensure that the Power Meter signal is not blocked by metal. The base of the antenna has a magnet and can be adsorbed on iron materials. After that, screw the External Antenna to the Antenna connector.

Hvis du installerer strømmåleren i det elektriske panel, kan du bruge en skruetrækker til at udstanse et knockout-dæksel i det elektriske panel. Før derefter det eksterne antennekabel gennem hullet.

Diagram showing how to install the external antenna, connecting it to the main unit and positioning it outside the electrical panel.

Figure 6: Antenna Installation

5.4. Clamp Main CTs around Service Mains

1. Open the clasps on the Main CTs (3.5mm audio plug) to see the arrow (P1→P2 or K→L) or find it on the sticker on the outside of the clamp. This indicates the direction of the CT.

Image showing the direction arrow on a CT clamp (P1 to P2).

Figur 7: CT Clamp Retning

2. Clamp one Main CT on each main service line. Make sure the arrow on the CT must point towards the breakers! Your system may have 1, 2, or 3 main service lines, and a corresponding number of Main CTs are required.

Wiring diagram for 3-Phase system showing Main CTs clamped on L1, L2, L3 lines pointing towards breakers.

Figure 8: Main CT Installation (3-Phase)

3. If you have Line/Service-side tap solar, the Main CT must be clamped mellem elmåleren og indgående feeds fra inverteren.

Wiring diagram for Split-Phase system with solar monitoring, showing Main CTs clamped between the electricity meter and inverter feeds.

Figure 9: Main CT Installation with Solar

4. Insert each 3.5mm audio plug of the Main CT into the corresponding audio jack on the top of the Power Meter. The jacks are labeled L1/A, L2/B, and L3/C.

Diagram showing how to connect Main CT audio plugs into the labeled jacks on the power meter for 3-Phase, Split-Phase, and Single Phase systems.

Figure 10: Main CT Plug Connections

5.5. Tilslut strømkablet

Tilslut strømkablet i bunden af ​​hovedenheden, indtil det klikker på plads.

Diagram showing the power cable connection to the bottom port of the main unit.

Figur 11: Strømkabeltilslutning

Secure the N wire from the power cable to the neutral bus bar and the L1 wire to the L1/A breaker pole.

For 3-Phase systems, secure the L2, L3 wires corresponding to the L2/B, L3/C breaker poles.

For Split-Phase systems, only secure the L2 wire to the L2/B breaker pole. The L3 wire needs to connect to the neutral bus bar.

For Single Phase systems, the L2 and L3 wires need to connect to the neutral bus bar.

5.6. Clamp Sub CTs around the Circuit (Optional)

If you don't have Sub CTs (2.5mm audio plug), skip this step.

1. Open the clasps on the Sub CTs to see the arrow (P1→P2 or K→L) or find it on the sticker on the outside of the clamp. This indicates the direction of the CT.

Image showing the direction arrow on a CT clamp (P1 to P2).

Figure 12: Sub CT Clamp Retning

2. Clamp each Sub CT around the circuit you wish to monitor. Make sure the arrow on the CT must point towards the load or Inverter!

Wiring diagram showing Sub CTs clamped around individual circuits, pointing towards the loads or inverter.

Figure 13: Sub CT Installation

Note: If the circuit you are monitoring can generate energy (such as an Inverter), after all wiring is completed, you must manually set the phase of the circuit in the app settings, otherwise the power measurement will be incorrect.

3. Insert each 2.5mm audio plug of the Sub CT into the audio jack on the side of the Power Meter. Remember the number of the audio jack connected to the circuit you are measuring, and you may need to match it in your app.

5.7. Wiring Reference Diagrams

Refer to the following diagrams for common wiring configurations:

Wiring diagram for a 3-Phase system, common in European homes and US commercial systems.

Figure 14: 3-Phase Wiring (Most in European 3-phase homes and US Commercial systems)

Wiring diagram for a Split-Phase system with load monitoring, common in US homes.

Figure 15: Split-Phase Wiring with Load Monitoring (Most in US homes)

Wiring diagram for a Split-Phase system with solar monitoring, common in US homes.

Figure 16: Split-Phase Wiring with Solar Monitoring (Most in US homes)

Wiring diagram for a Single Phase system, common in European 1-phase homes.

Figure 17: Single Phase Wiring (Most in European 1-phase homes)

6. Montering

The mounting bracket supports DIN-rail installation. You can click the three hooks on the mounting bracket onto the DIN-rail.

Diagram showing how to attach the mounting bracket to a DIN-rail.

Figure 18: Mounting Bracket to DIN-Rail

Locate the hooks of the mounting bracket and line up the hooks with the mounting holes on the Power Meter. Fit the hooks into the mounting holes as shown in the picture. Installation is now completed.

7. Konfigurer netværk

The device uses the Smart Life app for network configuration and monitoring. Note that the network cannot support 5GHz Wi-Fi!

7.1. Download app

Hent venligst applikationen: Smart liv from your App Store or App Market. You can also scan the QR code below to download and install.

QR code for downloading the Smart Life app.

Figure 19: Smart Life App QR Code

7.2. Network Configuration Methods

Here are three methods for device network configuration:

Method 1: Automatic Scan (Recommended)

  1. After the device is installed, power on the power clamp.
  2. Reset the device: Press and hold the reset button for 5 seconds until the LED indicator flashes red 3 times quickly.
  3. Open the Smart Life app and click the 'Scan' button in the upper right corner of the App Home page.
  4. The app will automatically scan for nearby devices and a prompt box will pop up. Click 'Add'.
  5. Enter your home Wi-Fi account and password (2.4GHz only) and click 'Next'.
  6. Wait for the device to be added and click 'Done'. The device has successfully configured the network.

Video: Installation and Network Configuration Guide

Method 2: Manual Scan with QR Code

  1. After the device is installed, power on the power clamp.
  2. Reset the device: Press and hold the reset button until the LED flashes red quickly 3 times.
  3. Open the manual to page 20 to see the QR code.
  4. Open the Smart Life app and click the 'Scan' button in the upper right corner of the App Home page. Scan the QR code from the manual.
  5. A prompt box will pop up. Click 'Add'.
  6. Enter your home Wi-Fi account and password (2.4GHz only) and click 'Next'.
  7. Wait for the device to be added and click 'Done'. The device has successfully configured the network.

Method 3: Manual Add with Bluetooth

  1. After the device is installed, power on the power clamp.
  2. Sørg for, at LED-indikatoren blinker grønt. Hvis ikke, skal du nulstille den.
  3. Open the Smart Life app and turn on Bluetooth on your phone.
  4. Open the app and click the '+' on the top right of the home page to add the device.
  5. Find the 'Energy' option and click 'Switch Module (Wi-Fi)' in the subdirectory 'Breaker'.
  6. Enter your home Wi-Fi account and password (2.4GHz only) and click 'Next'.
  7. Click 'Confirm the indicator is blinking'.
  8. The device indicator light flashes quickly, click 'Blink Quickly'.
  9. Wait for it to be added and click 'Done'. The device has successfully configured the network.

8. Operating the Device via Smart Life App

Once successfully configured, you can monitor and control your power meter through the Smart Life app.

8.1. Overvågning i realtid

The app provides real-time data on energy consumption and production. You can view:

  • Net Usage, Solar Usage, Home Usage.
  • Energy 'To Grid' and 'From Grid'.
  • Total Active Power, Total Current, Frequency.
  • Individual circuit data (Active Power, Current, Voltagog).
Smart Life app interface showing energy usage data: Production, Usage, To Grid, From Grid, Powered By Solar.

Figure 20: App Home Screen - Energy Overview

8.2. Historical Data and Charts

Access historical data and charts to track energy trends over time (Day, Week, Month, Year).

Smart Life app interface showing energy charts and historical data for production, usage, to grid, and from grid.

Figure 21: App Charts and Historical Data

8.3. Indstillinger og konfiguration

Within the app settings, you can configure various parameters:

  • Circuit Setting: Enable or disable individual circuits for monitoring.
  • Solar Setting: Configure settings related to solar production monitoring.
  • Sats: Set unified price per kWh and billing cycle start.
  • Enhed: Select energy units (e.g., kWh, Amps).
Smart Life app interface showing various settings screens including Circuit Setting, Solar Setting, Rate, and Unit selection.

Figure 22: App Settings

8.4. Stemmekontrol

The device supports voice control through Google Assistant and Amazon Alexa, allowing for hands-free operation.

Image depicting voice control with Alexa and Google Assistant, showing commands like 'Alexa, Turn on the power.' and 'Google, Turn off the power.'

Figur 23: Integration af stemmestyring

9. Vedligeholdelse

The EARU EASEM-D Multi-Circuit Power Meter is designed for low maintenance. Keep the device clean and free from dust. Ensure all connections are secure. No user-serviceable parts are inside the main unit; do not attempt to open or repair it.

10. Fejlfinding

10.1. Nulstil knap

Press and hold the reset button for 5 seconds until the LED indicator flashes red 3 times quickly to restore the Power Meter to default factory settings (energy data will not be cleared).

Hvis du vil slette energidataene, skal du slette enheden og slette data på appen og derefter tilføje dem igen.

10.2. LED-indikatorstatus

The LED status gives the following information about the Power Meter:

LED-statusHvad det betyder
Grøn LED blinkerVenter på parring
Grøn LED lyser konstantEnheden har oprettet forbindelse til skyen.
Rød LED lyser konstantEnheden er forbundet til routeren, men kunne ikke oprette forbindelse til skyen.
Rød LED blinkerWi-Fi er blevet konfigureret, men det lykkedes ikke at oprette forbindelse til routeren.

11. Brugertips

  • Integration af hjemmeassistent: As the device is Tuya compliant, it may be possible to integrate it with Home Assistant or other smart home platforms that support Tuya devices. Check the specific integration guides for your chosen platform.
  • Wi-Fi-netværk: Remember that the device only supports 2.4GHz Wi-Fi networks. Ensure your router is configured to provide a 2.4GHz band or that your phone is connected to the 2.4GHz band during setup.

12. Garanti og support

For warranty information, technical support, or service inquiries, please contact EARU customer service or refer to the official product page where you purchased the device. Keep your purchase receipt as proof of purchase.


Documents - EARU – EASEM-D-TY

ingen relevante dokumenter

Ask a question about this manual

Ask about setup, troubleshooting, compatibility, parts, safety, or missing instructions. Manuals+ will review the question and use this page’s manual context to help answer it.